Installation Tips

CLICK

2020-11-05

installation instructions

Tools needed

• Utility knife & straight edge

• Measuring tape

• Dead Blow Mallet

• Shears for cutting around irregular

shaped objects (pipes)

• 8mm spacers

• Pencil

• Tapping Block

Planks needed to complete your project. Measure and multiply the length & width of your

room. If the room has alcoves or offsets, measure these separately. This will give you the square meters of the room. Purchase a minimum of 10% extra to cover mistakes, trimming and for future needs andor replacement. Most installations require about 10% overage. However this can vary depending upon the room size and layout.


CLICKinstallation limitations:

Do not installCLICKover carpet or any foam underlayment. This product is not recommended for any outside use, sunrooms/solariums, saunas, seasonal porches, camping trailers, boats, RV's or rooms that have a potential of flooding. Protect CLICK from direct sunlight using window treatments or UV tinting on window.CLICKis not intended for use on vertical surfaces.

Three-season rooms (Residential Applications only)

CLICK click is permitted in residential “three-season rooms” when installed in strict compliance with the instructions listed below.

. Maximum room size of 500Sq.Ft.(46.5Sq.m)

.Room must be completely enclosed(roof,floor,walls and windows) and not exposed to any outside elements.

.Installation must occur at room temperature between 50ºF and 100ºF(10ºC and 38ºC)

. Allow 10mm expansion space around perimeter and all fixed objects.

. Do not put extremely heavy objects on the paved floor

CLICKis a floating floor system — i.e. must be free to expand and contract. Do not glue, nail, screw or fasten to substrate. Install cabinetry, island and peninsula counters, vanities, tubs, and showers first. Then install

CLICKaround them. Skirtings fitted extremely tightly/glued to the floor may inhibit expansion.


ConditionCLICKprior to installation

The Installation ofCLICKdoes not require acclimation. However we recommend installation in rooms with temperatures between 10°C & 38°C. Product should be stored horizontally in a dry area away from direct sunlight. Do not leave next to heat or cooling ducts. Ensure that all trades have been completed to eliminate dry wall dust, paints, etc.

NOTE: IfCLICKis subjected to extreme hot or cold temperatures prior to installation it may make the

product more difficult to install or cause damage to the locking system. Allow the product to reach room temperature before installation.


KEY INSTALLATION TIPS

Interior Environmental Conditions 10°C to 38°C & 40% to 60% relative humidity

Acclimation Not Required

Subfloor Flatness Tolerances 6.35mm over 3.05m or 3.18mm over 1.83m

Vapor Barrier (6 mil poly) Not Required

Underlayment Pad Required NO –CLICK

includes pre-attached pad

Radiant Heated Floors Must be cast 12.7mm below subfloor.

Substrate surface temperature should

never exceed 30° C

Perimeter Expansion 8mm gap around walls, space requirements

heavy fixed objects (cabinetry)

Glue Down Installation NOT RECOMMENDED – Voids the warranty

Connection Type I4FJoints (Click)

Free Floating Floor Yes. DO NOT screw or nail moldings, transitions, cabinetry or vents through ANYCLICKflooring Temp range before, during 10° C to 38° C.

and after installation: After installation temps should stay between 7° C to 50° C

Interior Product Only Yes. See limitations/exclusions below Storage Horizontally

Expansion Space Yes. For room perimeters and fixed objects please leave 8mm optimum space

Expansion Break An expansion break is required for every 20m x 20m area ofCLICKflooring installed. If exposed to high temperatures/sunlight,

Floor Flatness Tolerances 6mm over 3.05m. Use floor leveler when exceeding tolerance.

Special Tools Required  Yes. Utility knife and straight edge, measuring tape, Deadblow mallet(to tap and lock plank seams), shears, tapping block, pencil and 8mm spacers

Moisture Reading Guidelines; Based on Tramex Concrete Moisture Encounter Plus Meter

OVER CONCRETE (scale 0 to 6%)

Scale 0% to 4% No moisture barrier

Scale 5% to 6% Use 150 micron poly moisture barrier

Scale over 6% Seal concrete with waterproofing agent

Moisture Reading Guidelines; Never use 6 mil poly over wooden subfloors

OVER WOOD

Scale 0 to 13% OK to install. Do not install above 13% moisture levels

Primer Over Wooden Subfloors No

Basement Proofer over Concrete No

Moisture Barrier (6 mil poly) Yes above 5% only

Installs Over Radiant Flooring Yes. Electric or hydronic approved — best practice recessed

min 12.7mm below finished floor.

Substrate surface temperature should never exceed 30° C

Suspended Wood Floors Yes. 457mm minimum well ventilated crawl space

Use moisture barrier over ground/dirt

Especially for mobile home installations

Foam/Cushioned Underlayment No. Voids warranty if used in any application

Approved Subfloors - See Below Must be smooth, solid, dry and no deflection

Wood Yes. Solid, engineered, parquet, but not woods installed over concrete.

Plywood Yes. OSB & particleboard are approved forCLICKproducts only

Luan is approved for all products

Vinyl Yes. install over 1 layer only: Vinyl, linoleum, VCT, LVT, and Peel & Stick

Concrete Yes. Sealed, unsealed, poured in place gypsum.

On grade or below grade (see moisture guidelines)

Plank (Stone) Yes. Ceramic, Terrazzo, stone plank

(grout lines of less than 6mm is optimum)

Dricore xl Yes

Subfloors Not Approved Carpet (any type), foam underlayment, cushioned back vinyl,

rubber, cork, free floating floors

Subfloor Approved Products Primer - Custom Building Products Level Quik Primer

Basement Proofer - CBP (Custom Building Products), RedGard

Waterproofing & Crack Prevention Floor Leveler - CBP Level Quik

Limitations/Exclusions These types of installations will NOT be covered under warranty:

All exterior installations & seasonal porches, boats/campers/

RV's, sunrooms/solariums

Steam Cleaner DO NOT USE

Vertical Surfaces Not covered under warranty. Can be done using high quality

construction adhesive. Product not intended for this usage


Add:Hexing Street, Jinfeng Town, Zhangjiagang City, Jiangsu Province

COPYRIGHT@ 2020 ELETILE 苏ICP备14024213号-1 DigItal By VTHINK

Brand story| Products| Join us

Add:Hexing Street, Jinfeng Town, Zhangjiagang City, Jiangsu Province

Copyright © 2020. ELETILE 苏ICP备14024213号-1 BY VTHINK

中文| English| Español